during a remodel:
Make (very yummy) meat loaf in the oven in early September when the contractor has disconnected both the air conditioner and the attic fan. I believe the house is still 20 degrees hotter than the outside air.
***************************
The foundation for the breakfast room is poured! Chip loved that action.
They are also up on the roof adding floor joists but I can’t actually see any of that so while it is extremely loud, it isn’t quite as eventful. Seeing the inside of my attic from the street is a little disconcerting. So far, no feet though our ceilings.